Skip to Content Skip to Navigation

Hazelmere Logistics Case Study - Comprehensive Gate System Upgrade for Mainfreight

Hazelmeregateupgrade 6374

Client: Mainfreight (Global Logistics Company)

Location: Hazelmere, Western Australia

Challenge:
A major logistics warehouse faced multiple gate system failures affecting operational efficiency:

  • Compromised boom gate functionality across entry and exit points
  • Inadequate safety equipment for high-traffic commercial environment
  • Damaged sliding gate gear rack requiring immediate replacement
  • Water ingress compromising electrical power supply integrity
  • Faulty control board wiring on sliding gate system
  • Severely reduced traffic flow impacting delivery schedules

Solution:
AGM Automation implemented a comprehensive two-phase upgrade strategy:

Phase 1 - Sliding Gate Restoration

  • Complete wiring harness cleaning and reorganisation
  • Control board optimisation for enhanced functionality
  • Mechanical gear rack assessment and replacement
  • System integration testing and validation
Hazelmeregateupgrade 6370

Phase 2 - Boom Gate Infrastructure Overhaul

  • Strategic replacement of four existing boom gates
  • Comprehensive rewiring and cabling integration
  • Custom-engineered support bases to prevent water ingress
  • Internal wiring modifications for enhanced weather resistance
  • Advanced safety equipment installation with laser scanner technology
Hazelmeregateupgrade 2023 09 28 01 04 36

Results:

  • Restored optimal traffic flow through both driveways
  • Enhanced security with modern gate automation systems
  • Eliminated water ingress vulnerabilities
  • Improved delivery schedule reliability
  • Reduced operational disruptions and security concerns

Key Success Factors:

  • Comprehensive site assessment approach
  • Custom engineering solutions for environmental challenges
  • Licensed electrical contractor expertise
  • Minimal operational disruption during installation
  • Thorough handover and training protocols
Hazelmeregateupgrade 135917

Client Feedback:
Mainfreight reported exceptional project execution efficiency, with AGM adhering to established timelines without delays. The comprehensive handover process included detailed manual override demonstrations, instilling confidence in the operational capabilities of the installed systems.

Technical Insights:
Comprehensive site evaluations focusing on equipment suitability, gate design innovation, and automation systems meeting security standards are essential. Strategic implementation during off-peak hours minimises disruption to daily operations whilst ensuring optimal security and efficiency outcomes.

If you need help with your logistics electric boom or sliding gate set-up, or wish to automate any other gate configuration, feel free to contact Tim on (08) 9244 8899 to have a no-obligation chat or email tim@agmautomation.com.au for immediate assistance, today!