Hazelmere Logistics Case Study - Comprehensive Gate System Upgrade for Mainfreight
7 August 2025
7 August 2025
Client: Mainfreight (Global Logistics Company)
Location: Hazelmere, Western Australia
Challenge:
A major logistics warehouse faced multiple gate system failures affecting operational efficiency:
Solution:
AGM Automation implemented a comprehensive two-phase upgrade strategy:
Phase 1 - Sliding Gate Restoration
Phase 2 - Boom Gate Infrastructure Overhaul
Results:
Key Success Factors:
Client Feedback:
Mainfreight reported exceptional project execution efficiency, with AGM adhering to established timelines without delays. The comprehensive handover process included detailed manual override demonstrations, instilling confidence in the operational capabilities of the installed systems.
Technical Insights:
Comprehensive site evaluations focusing on equipment suitability, gate design innovation, and automation systems meeting security standards are essential. Strategic implementation during off-peak hours minimises disruption to daily operations whilst ensuring optimal security and efficiency outcomes.
If you need help with your logistics electric boom or sliding gate set-up, or wish to automate any other gate configuration, feel free to contact Tim on (08) 9244 8899 to have a no-obligation chat or email tim@agmautomation.com.au for immediate assistance, today!